Chen, W T and Huang, Y-H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), 1231-9.

  • Type: Journal Article
  • Keywords: Cost and duration; reconstruction project; regression analysis; neural networks
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190600953805
  • Abstract:

    Regression and neural network models have been developed to predict the cost and duration of projects for the reconstruction of schools which must be quickly rebuilt. Data for the school reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake, were collected and analysed. The analytical results demonstrate that the floor area provides a good basis for estimating the cost and duration of school reconstruction projects, and suggest that the neural network model with back-propagation learning technique is a feasible approach that yields better prediction results than the regression model for school reconstruction projects.

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), 1305-14.

Lu, S-L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: a case study of an architectural practice. Construction Management and Economics, 24(12), 1269-82.

Manley, K (2006) The innovation competence of repeat public sector clients in the Australian construction industry. Construction Management and Economics, 24(12), 1295-304.

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection?. Construction Management and Economics, 24(12), 1225-9.

Pan, N-F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), 1241-52.

Teo, E A-L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), 1283-93.

Tokdemir, O B, Arditi, D and Balcik, C (2006) ALISS: Advanced Linear Scheduling System. Construction Management and Economics, 24(12), 1253-67.